WILLIS LANE, HAMPTON
2 Willis Lane, Hampton. |
SULLIVAN ST, MOORABBIN
Sullivan Street, Moorabbin. |
CHELSEA FLOWER SHOW
2013 RHS Chelsea Flower Show UK. Trailfinders Australian Garden Exhibit |
484 ABBOTS RD, BOXHILL
484 Elgar Road, Boxhill. |
94 ABBOTS RD, HALLAM
94 Abotts Road, Hallam.21 unit Business Complex |
SANDRINGHAM YACHT CLUB
ECHUCA SALE YARDS
IZZAT STREET, PRAHAN
Apartment building
GENESIS GYM
Clyde Rd Berwick Gymnasium
IVANHOE
Five storey plus 3 storey basement multipurpose building
CHIFLEY, HOTEL COMPLEX
Dandenong
BUNNINGS HAWTHORN
|
EPSOM VILLAGE - BENDIGO
Woolworths Supermarket
RICKETTS RD ROWVILLE
Factory Development
MCLAREN STREET - BENDIGO
Office Building
PENGUIN BOOKS
Office and Distribution Warehouse
|
85m x 187m. 15895m2. 13m springing height structural design featured a propped portal frame with spine trusses so as to remove internal columns and lateral rigidity formed via horizontal bracing systems to bracing spines. The concrete floor system was constructed with steel fibre to an extremely flat tolerance to enable computer controlled forklift selection. |
SELF STORAGE WAREHOUSE
|
72m x 83m, 6.5msup>2 springing height feature Canopies. Double level self storage facility with first floor vehicle concourse and two levels of storage broken into 6 fire rated compartments. Site works, pavements, drainage, retaining walls and fire service.
|
CENTRAL CITY STUDIOS
Film & Television Studios
|
Central City Studios consists of 5 studios constructed specifically for movie production. Constructed in the Docklands on poor founding material, they also had to be acoustically sealed. They consist of steel framing up to 23m high, with precast wall panels & additional acoustic paneling to the internal walls and roof. Allowance was provided for heavy loads to be lifted from the ceiling framing. |
BECON CONSTRUCTIONS
Office Building
|
This state of the art facility highlights the latest forms of construction materials, with creative architecture. The building consists of a portal framed warehouse to the rear and an extensive office complex at the front. The concrete fins at the front were adopted as portal columns to provide stability to the office complex. |
SMITH & NEPHEW
Office Building
|
A three storey commercial building with undercroft/basement car park. Panel retaining walls, feature fin walls, canopies and steel-framed roof. Precast concrete on all floors. Structural lift core. Elevated panels overhanging second floor.
|
MONTCLAIR
Office Building
|
A three storey commercial building with basement. Eccentric and segmented footings required for boundary conditions. Overhanging canopy and fin walls, structural lift core, steel framed roof, extensive retaining walls and entry structure.
|
BRIGHTON BATHS
Restaurant & Gymnasium Complex
|
Redevelopment of the 1930's Brighton landmark. Stabilization of retained masonry facade during construction. The building was gutted and re-stabilized with double storey portal frames, with the higher storey cantilevered over the catwalk on the base side.
|
HAMPTON HARBOURSIDE
Redevelopment of Hampton Hotel
|
Renovation of the original Hampton Hotel site into 44 apartments and 6 - 3 storey town houses. The existing cellars in the hotel building were retained and incorporated into the development. Basement car parking was provided for each apartment. Construction consisted of concrete panel wall systems and post tensioned and conventional re-enforced concrete floors.
|
TULLAMARINE
Cadbury Schweppes
|
Warehouse and Canopy extension comprising of 90m Portal Frame building with 8m cantilever canopies heavily loaded hard stand areas with underground storm water system.
|
LILYDALE
Mitre 10 store x 7 Retail Tenancies
|
Portal Frame building with both lightweight and concrete internal mezzanine floors. Precast Panel tenancies with lightweight metal roof structure. Asphalt Car Park and Underground Storm Water & Fire Service System. |
DECORE DRIVE - STAGE 2
Hallam
|
4 Office & Showroom Development. Precast Panel Showrooms and Offices with lightweight Steel Roof Structure.4 Office & Showroom Development. Precast Panel Showrooms and Offices with lightweight Steel Roof Structure. |
DECORE DRIVE - STAGE 3
Hallam
|
4 19 Office and Warehouse Unit Development. Precast Panel Factoryettes with First Floor Mezzanine and lightweight steel roof. Precast Panel retaining walls and split level Asphalt car park. |
ALTONA
LaFarge
|
Extension to existing factory for LaFarge plasterboard. Comprising of Warehouse and 22m high Tower and 4 level steel mezzanine structures for expansion to manufacturing facility. |
PORTLAND
Keppel Prince
|
Extension to Manufacturing plant entailing design of 18m high Portal Frame structure with 32 tonne gantry crane running full length of building. |
BDD ENGINEERING PTY LTD
Contact: 03 9585 1544
33 Wangara Road
Cheltenham VIC 3192